HomeMaterials
Bags Manufacturer China - Luggage Factory
Do you have a question about a general product or service Oz Garments provides? Fill out the form below and we will get back to you as soon as possible.

Name:

Email:

Phone Number:

Message:

Materials

Oz Garments offers a wide variety of innovative fabrics in many different colors and textures to meet the needs of all of their customers. We keep our sample room stocked with many main fabrics so we can develop samples for you within days with our available materials. All of our materials used are tested in-house as well as being sent out for testing by other independent agencies such as SGS.

Oz Garments is constantly seeking out new and innovative materials and accessories to fuel the ongoing development of the products they create. For production we are able to use our in-house material or purchase any material our customer's request.

Below is our material lead time for materials and accessories:

MATERIAL LEAD TIME

DOMESTIC (CHINA) FABRIC LEAD TIMES 
10-15 days for locally manufactured Nylon and Polyester materials.
 
KOREA/ TAIWAN FABRIC LEAD TIMES
30 days needed to weave fabrics not in stock.
14 days to dye fabrics.
7 days required for all Lab Dips.
30+ days to source or manufacture 'special' fabrics.
10-14 days required for arrival of material to our facility.
*Lead times are based on 800 yards minimum.
*To avoid any delays, please include Pantone#. Any swatch should be at least 3x3 inches.

INJECTION MOLDING
1-3 days required to calculate mold charge upon receipt of specifications.
14-25 days are needed to make a mold.
2-5 days required for minor revisions, please specify material requirements.

3-D PICTURE RENDERING (CAD)
This is a very complex version of a design and is one of the process we need to be able to use the design for production. This is a service we offer for our clients free of charge.

EVA THERMOFORMING (Compression molding)
5-7 days to prepare mold.
*Cost is calculated according to size $100-$600USD.

CUSTOM ZIPPER PULLS
7-10 days needed to make mold.
*Mold charge will usually cost around $250USD.

EMBROIDERY
1-3 days needed upon receiving confirmation of sample.
Please make sure the logo size is sufficient for embroidery and avoid small lettering.
Please include detailed art work, dimensions and precise placement (actual size if possible). We can also design for you if needed.

SILK SCREEN
2-4 days needed to screen an average size logo (7 days for larger prints).
*Please include detailed artwork, dimensions and precise placement.

RUBBER LOGOS (TPR) 
7-10 days for mold (4 days for PVC)
* Include detailed Art work, dimensions, precise placement; location of stitch lines and thread color to be used for logo attachment (indicate grooves).

ACCESORIES
20 days needed for YKK or ESO zippers and sliders.
30+ days for accessories from Korea or other countries outside of China.
2-10 days for generic zipper pulls.
2-10 days for webbing (logo/special weave).
 

At Oz Garments we work closely with our material suppliers to make sure we manufacture and produce a range of bags in many different styles and colors with the correct material and effect. We use an array of different shell fabrics made from an abrasion resistant nylon or polyester, with denier ranging from 300D to 1680D. We also use name brand materials such as Maxtura® and Reflect-A-Light® for technical products such as motorcycle luggage and rainwear.
Copyright© 2011 Oz Garments (China) Co., Ltd. All rights reserved | www.BagManufacturer.com - China Bag & Luggage Manufacturer | Site Map